HT‑150

150kW Peak · Trailer‑Mounted · Field‑Ready

A trailer-mounted hybrid electric power platform built to run generation, propulsion export, and microgrid support from wherever the job takes it — drawn down by diesel, JP8, or Jet A, and backed by a 120kWh battery for silent operation when noise and exhaust aren’t an option.

Concept rendering of the HT-150 hybrid power platform deployed at a mine site, connected to field cabling with an operator at the control panel
Concept Rendering — HT‑150 Not an in‑service unit
150kW
Peak Power
100kW
Continuous HVDC
120kWh
Li‑Ion Battery
48hrs
Continuous Runtime
1MW
Max Microgrid Output

Specifications

Built for the deployment, not the datasheet.

Every system is configured to switch between power forms without a second unit on site.

Controls & Mobility

Operator Interface
Touchscreen HMI for full system control
Mobility
Off-road, 4-wheel independent suspension

Fuel & Endurance

Fuel Compatibility
Diesel, JP8, or Jet A
Fuel Capacity
220-gallon tank
Continuous Runtime
Up to 48 hours on a single tank

Power Output

Peak HVDC Power
150kW (600–800VDC)
Continuous HVDC Power
100kW (600–800VDC)
Configurable AC Output
Grid forming or rectifying, selectable by mission: 150kVA · 3-Phase · 277/480VAC 80kVA · 3-Phase · 120/208VAC (or 240VAC) 36kVA · 1-Phase · 208VAC (or 240VAC)
Auxiliary Output
5kVA, 1-Phase, 120VAC

Energy Storage

Battery
120kWh Li-Ion, for fully silent operation

Grid Integration

Micro-Grid Compatible
Parallel up to 10 systems
Max Combined Output
1MW power grid

Intelligent Power Modeling

Silent. Hybrid. Parallel.

The HT-150 shifts between three operating modes automatically, matching output to what the mission actually needs.

Mode 01

Silent

Runs on the 120kWh battery alone — no engine, no exhaust, no noise signature. Built for operations where staying quiet matters.

Mode 02

Hybrid

Engine and battery work together to sustain full continuous output, drawing on stored charge to smooth demand spikes.

Mode 03

Parallel

Link up to 10 HT-150 units into a shared microgrid for up to 1MW of combined power across a site.